HomeDigital GoodsEducationPrimavera P6 Professional 19.12 x64 [Lifetime]
Primavera P6 Professional 19.12 x64 [Lifetime]

Primavera P6 Professional 19.12 x64 [Lifetime]

New Seller|SKU: 20221219131355

• Lifetime License • Valid for 1 windows PC • Digital downloadable Version • NO CD/DVD • Remote license installation or Installation Guide

LKR 12,000
KOKO Pay LKR 4,360.00 × 3 installments with KOKO

Quick Overview

Availability:In stock
Brand:No Brand
What's in the box:Download Link and Activation Support
Warranty:12 Months
Payment options

Installment Plans

Select a Bank to View Available Monthly Plans

100% Satisfaction Guaranteed

• Lifetime License • Valid for 1 windows PC • Digital downloadable Version • NO CD/DVD • Remote license installation or Installation Guide

Product Details

Oracle’s Primavera P6 product is one of the best, most powerful, most reliable project management, design and implementation programs. This software is a perfect solution for managing projects and designs in any size and size and with any degree of difficulty.

Primavera P6 software is also used to schedule and control various projects. In construction, industrial and software projects where various activities are carried out on a regular basis, this software can also be used to schedule and control the project and to estimate the cost of those projects.

Oracle’s long-standing Primavera P3 product is used in a variety of forms by 25% of the world’s heavy industry. Nearly 40% of general contractors with annual revenues of $ 5-10 million use Primavera. By comparison, the P6 software did not participate in the US CFMA 2008 industry study . Changes to the Primavera P6 version are more about moving from DOS shortcuts to mouse-click icons than the Primavera P3 version .


Features

• Having a proper environment for updating and comparing expected and actual status

• Group projects

• Definition of Work Breakdown Structure (WBS)

• Defining and assigning work calendars

• Filter and Organize

• Updating

• Earned Value Indicators

• Reporting

• Make global changes or Global Chang

• Network Definition of Activities

• Defining time constraints (Constraint)

• Resource Definition, Allocation and Leveling

• Assigning Resource Curve

• Defining and allocating inflation at the expense of resource use

• Hammok and WBS activities and…


Technical Details and System Requirements

Supported OS: Windows 11/ Windows 10 / Windows 8.1 /Windows 7

Processor: Multi core Intel Series or above, Xeon or AMD equivalent

RAM: 4GB (8GB or more recommended)

Free Hard Disk Space: 4GB or more recommended


Digital Download link offered and Customer should download the digital copy. After Purchase, the Buyer requested to provide a Gmail address for the files to be shared via Google Drive. The license will be activated for lifetime by a technician (via Teamviewer) or a guide will be offered.

Seller selection

More from Seller

View Seller Store

Primavera P6 Professional 19.12 x64 [Lifetime]

New Seller
LKR 12,000
KOKO Pay LKR 4,360.00 × 3 installments with KOKO
Quantity
  • WeightN/A
  • Sold1
  • BrandNo Brand
  • StockIn stock

Short Description

• Lifetime License • Valid for 1 windows PC • Digital downloadable Version • NO CD/DVD • Remote license installation or Installation Guide

Product Details

Oracle’s Primavera P6 product is one of the best, most powerful, most reliable project management, design and implementation programs. This software is a perfect solution for managing projects and designs in any size and size and with any degree of difficulty.

Primavera P6 software is also used to schedule and control various projects. In construction, industrial and software projects where various activities are carried out on a regular basis, this software can also be used to schedule and control the project and to estimate the cost of those projects.

Oracle’s long-standing Primavera P3 product is used in a variety of forms by 25% of the world’s heavy industry. Nearly 40% of general contractors with annual revenues of $ 5-10 million use Primavera. By comparison, the P6 software did not participate in the US CFMA 2008 industry study . Changes to the Primavera P6 version are more about moving from DOS shortcuts to mouse-click icons than the Primavera P3 version .


Features

• Having a proper environment for updating and comparing expected and actual status

• Group projects

• Definition of Work Breakdown Structure (WBS)

• Defining and assigning work calendars

• Filter and Organize

• Updating

• Earned Value Indicators

• Reporting

• Make global changes or Global Chang

• Network Definition of Activities

• Defining time constraints (Constraint)

• Resource Definition, Allocation and Leveling

• Assigning Resource Curve

• Defining and allocating inflation at the expense of resource use

• Hammok and WBS activities and…


Technical Details and System Requirements

Supported OS: Windows 11/ Windows 10 / Windows 8.1 /Windows 7

Processor: Multi core Intel Series or above, Xeon or AMD equivalent

RAM: 4GB (8GB or more recommended)

Free Hard Disk Space: 4GB or more recommended


Digital Download link offered and Customer should download the digital copy. After Purchase, the Buyer requested to provide a Gmail address for the files to be shared via Google Drive. The license will be activated for lifetime by a technician (via Teamviewer) or a guide will be offered.

Digital Delivery: Sent directly to your registered e-mail address.

Maximum delivery timeframe: 12 hours.

Return & Warranty
7 Days Buyer ProtectionYour purchase is protected by Tudo.lk.
12 Months seller warranty

No reviews yet for this product.

seller
Research Softwares
Sainthamaruthu
Ship on time100%
Overall rating100%
Total Qty: 1LKR 12,000
StockIn stock